American Standard Milano CCAS1830 Installationshandbuch - Seite 3
Blättern Sie online oder laden Sie pdf Installationshandbuch für Toiletten American Standard Milano CCAS1830 herunter. American Standard Milano CCAS1830 4 Seiten.
5
ASSEMBLE THE TANK
Assemble the tank fittings.
Attach the water supply hose properly to the water
control valve on the tank and tighten snugly by hand.
7
CHECK LEVEL
After the above installation, check level of the toilet.
9
FINISH THE TOILET
6
POSITION THE TOILET
Lift the toilet with the tank trim assembly, position
the toilet on the floor as picture shown.
8
FIX THE TOILET
Fix the toilet with the floor by using the screw with
the floor fixing set.
Attach the water supply hose.
Install the seat & cover according to seat & cover
installation manual.
Apply a silicone putty along the intersecting
edge of the toilet base and floor, ensuring a
complete seal. Remove excess sealant.
Note: Silicone is not supplied in the packaging.
Using cement to fix the toilet is prohibited.
- 3 -
Dec.14
Rev.01