EKKO EB12-138 Handbuch - Seite 9

Blättern Sie online oder laden Sie pdf Handbuch für Hebesysteme EKKO EB12-138 herunter. EKKO EB12-138 18 Seiten. Full electric straddle stacker

3. Inspection, transport, outage
3.1 Test
Inspecting on receipt of your new stacker, the following steps before operating the equipment: The
equipment should be at full charge. (see Chapter sixth) Work according to the inspection and routine
inspection of the equipment.
3.2 Lifting / Transport.
When transporting, the removal of the goods, the fork must be lowered to the lowest position, and
according to the following chart secure equipment.
Lifting:
Please use the special cranes and lifting equipment;
Please don't stand underneath the stacker;
Please do not have anyone near or stand near the equipment when lifting anything
Strapping or lifting the stacker by its lifting hooks is shown in figure 5 or to tie down the body.
Fig. 5: Used crane hoisting
- 9 -
- 9 -