DAB PUMPS PULSAR DRY 30/80 Handbuch - Seite 6

Blättern Sie online oder laden Sie pdf Handbuch für Water Pump DAB PUMPS PULSAR DRY 30/80 herunter. DAB PUMPS PULSAR DRY 30/80 11 Seiten.

DAB PUMPS PULSAR DRY 30/80 Handbuch
7.
INSTALLATION PULSAR – PULSAR DRY
7.1.

Site of installation of the PULSAR

Before immersing the electropump in the pit or tank, ensure that the place is free from sand or
solid sediment.
If there is sediment, accurately clean the site where it is to be placed.
Keep the pump raised at least 1 mt above the bottom of the pit so that any deposits that form
after installation will not be sucked up.
Remove the sediment periodically.
It is very important to ensure that the water level never falls below the body of the pump.
(Fig.1).
7.2.

Working conditions of the PULSAR

Water temperature: from 0°C to +40°C.
Pump body always completely immersed.
The pump cannot operate when dry.
Installation in vertical or horizontal position.
The housing pit must be frost-free.
Maximum depth of immersion 20 mt. (below water level).
PULSAR
max..
min.
ENGLISH
150 mm min
Fig.1
22
fixing rope
non return valve