AMERITRON AL-1200 Gebrauchsanweisung - Seite 5
Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Verstärken AMERITRON AL-1200 herunter. AMERITRON AL-1200 15 Seiten. Full power linear amplifier
METERING
The AL-1200 has two illuminated meters. The Grid Current
meter provides a continuous indication of the 3CX1200A7 grid
current. This exclusive feature of Ameritron amplifiers indicates
proper amplifier operation better than any other parameter. Do
not exceed 300 mA on this meter during normal operation of
this amplifier. The other meter reads Plate Voltage (HV), Plate
Current (IP), Peak RF Watts (PO) and ALC. These functions are
selected with the Multimeter Switch.
Plate Voltage (HV): Read DC Plate Voltage on the 4000 volt
scale. This scale is 100 volts per division. Normal voltages are
6
00 volts no load, 3300 volts full load.
3
Peak RF Watts (PO): Read Peak RF Watts on the 2000 watt
scale. This scale has 50 watt divisions below 1000 watts and
100 watt divisions above 1000 watts.
TRANSFORMER INSTALLATION
Remove the cover of the amplifier. Remove the package that is
in the plate transformer area. This is the fuse pack and chimney
for the AL-1200. Remove the top 7/16" nuts from the four
transformer mounting bolts inside of the amplifier. Carefully
remove the transformer from its shipping carton.
Place the transformer on the four
care because the transformer is heavy. The side with the two
high voltage secondary RED leads must be adjacent to the center
panel(see Fig. 1). Now place a 7/16" nut on each bolt (see Fig.
2). Snug the nuts down manually. Do not tighten with a ratchet
wrench.
1
Remove the brass
/4" hex nuts and the top flat washer from the
two brass 6-32 screws on the rectifier board (see Fig. 1). Install
the RED lead ring terminals on the screws and replace the flat
washers and 1/4" hex nuts. Position the wires so that the black
insulated areas are at least
1
objects. Now tighten the
For 240V Operation (factory wired):
The four primary leads have colored plastic insulating boots
over the quick disconnect terminals. Slide these back prior to
installing the leads. Install the color coded boots as follows:(see
Fig. 1)
BLUE (Brown wire) to the top relay terminal
YELLOW (Black/White) to the top terminal of terminal
block
CLEAR (Black wire) to the second terminal of terminal block
RED (Brn/Wht-240V)(Grn-220V) to the bottom terminal of
terminal block
1
/4-20 mounting bolts. Use
1
from each other and any metal
/4"
hex nuts.
/4"
NOTE:
This circuit uses an emitter follower to charge a
capacitor to the peak envelope voltage detected by the
ALC/Power Board. Accurate peak envelope power readings are
given when the amplifier is connected to a 50 ohm nonreactive
load. If the amplifier is used with a mismatched load, the power
meter will read higher or lower than normal by a ratio up to the
value of the SWR. Potentiometer R5 on the Meter Board (50-
01140-1) adjusts the calibration of the power meter.
ALC: Indicates a relative drive level (average, not PEP) that
can be estimated by dividing the Peak RF Watts scale by 10.
NOTE: There is a neutralization tab mounted on a ceramic
standoff near the 3CX1200A7. This tab increases the
amplifier's efficiency on 21 and 28 MHz. DO NOT CHANGE
THE POSITION OF THIS TAB.
INSTALLATION
Now slide the colored insulating boots back over the terminals.
Important: The leads must be in the positions indicated by the
color coded insulating boots(see Fig. 1) for 240V operation. For
220V operation, see page 5. Caution: Do not use the 220V
wiring unless the line voltage is always below 220 VAC. The
Standard USA voltage is 240 VAC, not 220.