DoorHan SECTIONAL-500PRO Installations- und Betriebshandbuch - Seite 5

Blättern Sie online oder laden Sie pdf Installations- und Betriebshandbuch für Toröffner DoorHan SECTIONAL-500PRO herunter. DoorHan SECTIONAL-500PRO 18 Seiten. Operator

DoorHan SECTIONAL-500PRO Installations- und Betriebshandbuch
RISK OF INJURY!
WARNING!
Have a qualified technician lay the cables 230 V AC. The cables must be laid in protective corrugated tubes. In case
of supply cable damage, use the suitable type of the cable.
Cables needed for installation of sectional-500 operator and accessories (if available)
Cable 2 × 0.5 mm
(photocell transmitter)
2
Cabel 4 × 0.5 mm
(photocell receiver)
2
Cable 3 × 1.5 mm
(power supply)
2
The cables should be appropriately insulated
3. OPERATOR UNIT
3.1. OVERALL DIMENSIONS
3.2. DRIVE DEVICE
1.
Display cover
2.
Housing cover
3.
LED lamp
4.
Display
5.
Motor reducer
6.
Control board
7.
Housing
8.
Reference point microswitch
9.
Splined bushing

OPERATOR UNIT

1
2
3
4
5
6
7
8
9
5