DoorKing 115 VAC 6300 Handbuch - Seite 4
Blättern Sie online oder laden Sie pdf Handbuch für Toröffner DoorKing 115 VAC 6300 herunter. DoorKing 115 VAC 6300 5 Seiten. High voltage kit
Model 9150
Installation for a 115 VAC 9150 operator ONLY.
Step 1:
Mount step-down transformer on the (4) four existing threaded studs (below the motor) using the (4) four nuts supplied with this kit.
Attach the wires acrossed the top of the main support bracket. Avoid moving parts.
TIP: It is MUCH easier to install the step-down transformer before mounting the operator and attaching the chain. Flip operator upside down for access.
Step 2:
Wire the step-down transformer for the desired input voltage chosen (see first page).
Important Notes:
Dual Gate Operators Installation:
a step-down transformer and AC input power wire is required for
EACH operator.
"Optional" Heater Installation:
a heater, refer to the "high voltage AC
power wire size and distance
limitations" table on the instruction
sheet with the heater kit for AC
input power wire run
limitations.
Operator MUST be
properly grounded.
Chassis Ground
Keep wires away
from moving parts.
Variable Input Power
(see first page)
2600-267-G-6-16
When installing on bi-parting gates,
When installing
Main
Support
Bracket
115 VAC Operator
Power Terminal
Hot
Neu
Neu
Hot
Hot
115 VAC Output
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
Black
input voltage WILL damage operator and VOID warranty.
White
115 VAC Output
l
i n a
e r m
r T
w e
P o
DANGER
HIGH VOLTAGE!
n
o w
p - D
e r
S t e
o r m
n s f
g
t i n
T r a
u n
M o
i o n
s i t
P o