Cola DIANA CERAMICA Handbuch für Installation, Gebrauch und Wartung - Seite 8
Blättern Sie online oder laden Sie pdf Handbuch für Installation, Gebrauch und Wartung für Herde Cola DIANA CERAMICA herunter. Cola DIANA CERAMICA 17 Seiten. Woodburning cooker
2.2 Plinth assembly
1-
Engage the tab of the side plinth in the relative location (Fig. 5a- 5b)
Fig.5a
2- Fix the side plinth with the two retaining screws (fig. 5c)
3
- After fixing the two side plinths, insert the front plinth in its location and secure with the retaining screws
(fig.6a-6b)
Fig. 6a
2.3 Ceramic tile assembly instructions
Fit the ceramic tiles as follows:
(fig.7) Remove the screws securing the rear
tile trim (a).
(Fig. 9) position two of the rubber buffers
supplied on the top edges of the ceramic
tiles and the plinth
Fig.5b
Fig. 6b
b
a
(Fig.8) Insert the tiles in the groove
of the front tile trim (b) taking care not to
chip the edges.
10
(Fig.10) detail showing positioning of rubber
buffers on ceramic tiles
7
Fig.5c
cm
DIANA