Fig. 5
Dimensions of the passage opening at the installation
location
Determine the dimensions of the base profiles:
TIPS AND RECOMMENDATIONS
It is recommended that the dimensions of
the last section of the base profiles on the
floor are only measured and cut just before
installation of the final side panel.
4.2 Create diagram of
installation scenario on site
TIPS AND RECOMMENDATIONS
The FV55-1619 mounting profile is
recommended for ceilings with a flatness
deviation greater than 15 mm per 10 m.
• The installation situation on site may vary from the
planned unit.
• Installation measurements and tolerances of
components must be checked and observed before
installation.
• If Installation measurements and tolerances
deviate, there is a risk of glass breaking.
1.
Establish installation measurements on site.
2. Special requirements specific to installation must
be taken into consideration, e.g. joint mounting of
the mounting profile.
3. Compare the installation measurements on site
against the plans or project-related unit drawing.
10
UNIQUIN System
A
C
WN 059609 45532
4. The installation measurements on site must
enable installation to be carried out within the
specified tolerances.
Acoustic units:
5. When determining the dimensions, take into
account the mounted base profiles.

4.3 Installation sequence.

The following installation sequence applies to a
UNIQUIN unit with all the components listed.
TIPS AND RECOMMENDATIONS
The exact installation steps can be found in
the installation manuals for the individual
components.
1.
Base profile for the mounting profile (one side up
to the opening for the door frame or acoustic
element)
2. Door frame positioner
3. Acoustic element(s)
4. Continue base profiles of mounting profile
5. Side panel(s)
6. Sliding door(s) e.g. with overpanel
7.
Base profiles for the door frame
8. Electromodule
9.
Hinges, cover profiles for the door frame
10. Door wit lock system and access control if
applicable
11. Door closer for glass or wooden door
12. Drop-down seal for glass door
13. Cover profile for the mounting profile
→ The dimensions of the required end profiles
are checked or determined.

5 Commissioning

The unit is commissioned once installation of all unit
components has been completed by qualified
personnel.
Check the following before initial operation:
• The unit conforms with the plans or project-related
unit drawing, if available (especially for emergency
and escape routes).
• All installed unit components are to be used as
intended.
• The components are installed according to the
installation manual and all listed tolerances.
• The unit functions according to requirements, e.g.
for doors with panic function.
Commissioning
2018-12