Dover PSG Mouvex AZ O Installation, Betrieb und Wartung - Seite 3

Blättern Sie online oder laden Sie pdf Installation, Betrieb und Wartung für Water Pump Dover PSG Mouvex AZ O herunter. Dover PSG Mouvex AZ O 19 Seiten.

Dover PSG Mouvex AZ O Installation, Betrieb und Wartung
Weight
: 6 kg
support
(7 kg with
E
Bypass valve.
Space required for removing pump.
P
Pump plate.
PAT
Support foot pump.
S
Mounting point for probe : M6 - threaded width : max. 8 mm.
The pump can be delivered with support foot pump or not to
be flanged.
The pump can be fixed in any position.
Chain or belt drive.
Shaft end supported by ball-bearing.
Place pulley as near as possible to ball-bearing.
NT 1003-A00 09 18 AZ O e

1. OVERALL DIMENSIONS

foot)
The sound level of a pump is greatly influenced by its condi-
tions of use. Cavitation and pumping products with high gas
contents generally increases the sound level.
Under the following pumping conditions :
• excluding cavitation
• discharge pressure : 5 bar
• speed of rotation 1500 rpm
• product viscosity of 1 cSt
The sound level reached for the AZ pump in good conditions
(ignoring the motor and gearbox noise) is less than 77 dB(A).
3/19
Noise level