Amphenol Telect nrgCONTROL-BT Installationshandbuch - Seite 6
Blättern Sie online oder laden Sie pdf Installationshandbuch für Controller Amphenol Telect nrgCONTROL-BT herunter. Amphenol Telect nrgCONTROL-BT 11 Seiten.
2.2 Rack Mounting
The nrgCONTROL-BT panel can be mounted in 19-inch and 23-inch EIA and WECO racks.
The nrgCONTROL-BT panel can be flush-mounted to 4-inch extended in
1. Unscrew the mounting brackets from the panel and turn them to the mounting position.
See Fig. 4 and Fig. 5 below.
2. Locate an unused rack position and mount panel to the rack using the screws provided. It is best to mount the panel
as high as possible on the rack.
3. Tighten screws to 35 in/lb. (4.29 N•m).
NOTE: Use a seismic rack for best rigidity. If you intend on installing more than one panel per rack, plan a rack
arrangement that dissipates heat efficiently.
nrgCONTROL-BT
Fig. 4: Bracket orientation as shipped
Fig. 5: Bracket orientation or rack mounting
6
1
/
" increments.
2
All rights reserved. 07.20.2018 145122-4
1-509-926-6000 — telect.com
Amphenol Telect