Dover OPW Midland A-522-C2-MOSJ-SU-TF Anweisungen für die Demontage - Seite 4
Blättern Sie online oder laden Sie pdf Anweisungen für die Demontage für Kontrolleinheit Dover OPW Midland A-522-C2-MOSJ-SU-TF herunter. Dover OPW Midland A-522-C2-MOSJ-SU-TF 5 Seiten. Sulfur bottom outlet valve
Remove retaining ring (Part Number 522-18-MOL in Figure 3-3).
Reach both hands into the valve body (item 4) on either side of the valve ball
(item 3). Lift the ball out of the body and set it on a padded surface.
Remove the locknut (Item 13) from the valve stem (item 2) by turning it
counterclockwise.
TIP: Use a 1-1/8" wrench.
Remove the stop plate (item 8) and then
carefully press the valve stem (item 2) into the
body (item 4) cavity and remove it.
TIP: The use of a brass or plastic
hammer may be required to overcome
the resistance of the compressed
stem packing.
Remove the stainless-steel spacer collar (Item 6) from the valve-stem bore.
Visit midlandmfg.com for latest manual revision and revision history.
Figure 3-7 Remove Spacer Collar
Manual content is subject to change.
Figure 3-4 Remove Valve Ball
Figure 3-5 Remove Locknut
Figure 3-6 Remove Stop Plate and Stem
P/N: A-522-C2-XX-SJ-SU, Rev. 0
Issue Date: August 6, 2020
Page 4 of 5