Follett HCF1000RBT Installationsanleitung Handbuch - Seite 11
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Eiswürfelbereiter Follett HCF1000RBT herunter. Follett HCF1000RBT 17 Seiten. For ice storage bin top-mount applications
Connect louvered docking assembly to ice machine.
7.1
Ice transport tube installation
➋
• Slide ice machine into louvered docking
➊
assembly
• Insert ice transport tube all the way into
coupling and tighten nut fi rmly
7.3
Refrigeration lines
• Rotate and braze refrigerant lines
BIN • TOP-MOUNT
➊
➋
➊
➊
remote condensing
Internal connections
7.2
Water and drain lines
• Insert potable water line into valve
• Push drain line over hose barb on
back of evaporator mount
7.4
Power cord
• Remove twist tie
• Carefully pass plug thru opening and plug
into wall outlet
7
➊
➋
➊
➋
➊
➋
11