Dowco X24RS Einbauanleitung - Seite 5

Blättern Sie online oder laden Sie pdf Einbauanleitung für Bootsausrüstung Dowco X24RS herunter. Dowco X24RS 5 Seiten. 2018-2019 g3 full / front enclosure / double canopy

STEP 4
Zip all curtains together. NOTE: Leaving a zipper unzipped slightly may ease the starting of the adjacent zipper.
STEP 5
Leave the bottom of the curtains draped over the pontoon rails
STEP 6
Make sure the bottom of the curtains are hanging the same length on both sides of the pontoon. This is where centering both of the canopy
tops is very important. If the curtains are uneven, you may have to remove all the curtains and re-center one or both canopy tops.
FIG. 5
AFT CURTAIN)S)
INSTALLING SCREW STUD FASTENERS (FIGURE 5)
STEP 1
Make sure all the curtains are zipped together.
STEP 2
Start with the aft side curtains. Make sure the lower front corner of
both curtains hang the same distance from the door opening. Mark
the location of the nearest snap (A) on the aluminum rail and install
stud.
STEP 3
Find the last snap (B) on the same side. You may have to adjust the
curtain bottoms by pulling the curtains taut so they appear smooth
along the rail. You do not want the curtains to appear "wavy". Mark
and install the stud.
STEP 4
Find the first snap (C) on the same side. Install the remaining studs.
CARE
WARNING
Do not trailer boat with any canopy top up (in radar arch position) or with the enclosure assembled!
Dowco Marine, Inc. | 1610 Frisco Drive, Lebanon MO 65536 | dowcomarine.com | (800) 404-5252
AFT SIDE CURTAIN
BOW SIDE CURTAIN
(PORT)
AFT CANOPY
AFT SIDE CURTAIN
BOW SIDE CURTAIN
(STARBOARD)
B
PORT
AFT
STARBOARD
B
(PORT)
BOW CANOPY
BOW CURTAIN(S)
(STARBOARD)
A
DOOR
TYPICAL OVERHEAD VIEW
DOOR
A
C
DOOR
BOW
C
140133-00 | 02/19