Follett Horizon Elite Chewblet HCD1410NBS Installationsanleitung Handbuch - Seite 7
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Eiswürfelbereiter Follett Horizon Elite Chewblet HCD1410NBS herunter. Follett Horizon Elite Chewblet HCD1410NBS 16 Seiten. For drop-ins
Auch für Follett Horizon Elite Chewblet HCD1410NBS: Handbuch (8 seiten), Installationsanleitung Handbuch (17 seiten), Handbuch (8 seiten)
Install the docking assembly.
BEFORE PROCEEDING
Prior to installing the docking assembly, ensure that the drain fitting
is oriented (right or left) correctly for your installation. An optional
straight drain fitting is also supplied. You may need to remove the
back panel of the docking assembly in order to re-orient or change
the drain fitting. Replace back panel prior to mounting the docking
assembly.
Wall bracket accessory
• Mount docking assembly to wall bracket
accessory
2.1
4.1
Docking assembly
2" (50,8 mm)
3/8˝ ∅
high pressure
line
1010, 1410:
5/8" ∅ low pressure line
• Mount docking assembly
• "Rough-in" the refrigerant piping
BIN • RIDE Technology
1.88" (47,8 mm)
➋
➊
1" (25,4 mm)
Stub Typ
3.38" (86 mm)
➊
➋
remote condensing
Docking assembly
Machine stand accessory
• Mount docking assembly to machine
stand accessory
➊
4
7