Follett Horizon Elite Chewblet HCD1410RVS Installationsanleitung Handbuch - Seite 6
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Eiswürfelbereiter Follett Horizon Elite Chewblet HCD1410RVS herunter. Follett Horizon Elite Chewblet HCD1410RVS 17 Seiten. Ice machine with ride technology
Auch für Follett Horizon Elite Chewblet HCD1410RVS: Handbuch (8 seiten), Handbuch (8 seiten)
Prepare the dispenser.
2.1
3.1
Bin Signal Installation
• Mount the electrical box to the side of the Vision dispenser
Note: If a 4 x 4 box is mounted to a non-grounded surface, connect ground wire at an
appropriate ground.
• Connect the bin signal plug on the electrical box to the bin signal cord on the bin
• Insert 24" (70 cm) of the long bin signal cable
➍
and secure in place with strain relief provided.
• After sliding the ice machine module into the docking station, disconnect one wire from shuttle
switch and replace with wire from adapter plug.
• Connect wire removed from shuttle switch to male connector on adapter plug wire.
• Complete normal installation procedure for the ice machine using the installation manual that
shipped with the ice machine.
• Connect adapter plug into bin signal plug.
6
➎
➌
24"
(610 mm)
➌
into the hole in the back of the docking station
➎
➐
remote condensing
Dispenser preparation
➏
➐
➍
➊
to establish a ground connection.
VISION • RIDE Technology
3
➋
Ground
➊
➋
➏