Follett Horizon Elite HCD1810NJS Installationsanleitung Handbuch - Seite 5

Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Eiswürfelbereiter Follett Horizon Elite HCD1810NJS herunter. Follett Horizon Elite HCD1810NJS 17 Seiten. Ice machine models with ride technology
Auch für Follett Horizon Elite HCD1810NJS: Schnellstart-Handbuch (8 seiten), Handbuch (8 seiten)

Follett Horizon Elite HCD1810NJS Installationsanleitung Handbuch
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation of
low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
• 120/60/1-5 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drains:
3/4" Barb for silicone drain, 3/8" push-to-connect for chassis drain
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4mm/0,3m).
Refrigeration lines
• 7/8" ∅ (22,4 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
DROP-IN • RIDE Technology
(3/8" push-in internal connection, 3/8" OD tubing required)
remote condensing

Site preparation

7/8" ∅ (22,4mm)
3/8" ∅ (9,5mm)
chassis
drain must
be used
NEMA
5-15
1/4" per foot
(6,4 mm per 0,3 m)
2
3/8"
2 ft. x 1" OD
silicone tubing
and ttings
provided
5