Downee Spring Gate Handbuch installieren - Seite 9

Blättern Sie online oder laden Sie pdf Handbuch installieren für Zäune & Tore Downee Spring Gate herunter. Downee Spring Gate 14 Seiten. Double gates

POWER UP MOTOR ONE
1.
Remove the Motor cover and the inner control
board cover.
2.
Use a screwdriver to punch a hole in the cable
entry point provided (right).
3.
Run the battery cable from Battery Box to motor via the new hole.
Then divert wire to left side through the hole used to route wires in
the grey plastic base.
4.
Strip the ends of the brown & blue
wires (white outer cable).
5.
Remove two black wires from
the 22VAC INPUT terminals
and pull them through and
out of the way.
6.
Connect the brown & blue
wires from the battery into
the 22VAC INPUT terminals.
6
Bottom View
22VAC
INPUT