Follett Horizon series Installationsanleitung Handbuch - Seite 5
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Eiswürfelbereiter Follett Horizon series herunter. Follett Horizon series 17 Seiten. For ice manager diverter valve
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
2.1
2.1
Installation site requirements
➊
Electrical
• 120/60/1-6 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water fi ltration system (item# 00130286)
➌
Drain
• The drain line from the ice machine must have at least 1/4" per foot pitch (6,4mm/0,3m)
➍
Refrigeration lines
• 1000, 1400: 5/8" (15,8mm) diameter suction (insulated)
• 1650: 7/8" (22,2mm) diameter suction (insulated)
• 3/8" (9,5mm) liquid
ICE MANAGER
1/4"
1'
➋
➎
remote condensing
➌
➍
➍
➍
➍
Site preparation
NEMA
➊
5-15
➎
3/8" ∅ (9,5mm)
➍
2
5