AMQ Activ Pro 2.0 Montageanleitung - Seite 16

Blättern Sie online oder laden Sie pdf Montageanleitung für Inneneinrichtung AMQ Activ Pro 2.0 herunter. AMQ Activ Pro 2.0 20 Seiten.

AMQ Activ Pro 2.0 Montageanleitung
Phase 9 | Connecting Handset and Power
Step 1
Make sure that the Left motor plugs into the M2
port, and the Right motor plugs into the M1 port.
Step 2
Connect power plug after the motors and
handset are connected properly.
Step 3
Reset the base by holding the down arrow
button until it reaches its lowest height.
Left
motor
Handset
Left motor
Connect each plug according to the drawing.
Orient yourself to the table assembly by facing
as a user to identify the left and right motors.
Activ Pro 2.0 Assembly Guide | 16
Facing
Direction
Power
Right
motor
Power
Step 4
Attach the plastic cable management to
desired area to secure cables and wires.
Step 5
Organize the exposed wires into the
Wire Management box. Then close the
Wire Management Cover.
Handset
Right
motor
amqsolutions.com