Dr. A. Kuntze K 100 W PR Handbuch - Seite 12
Blättern Sie online oder laden Sie pdf Handbuch für Messgeräte Dr. A. Kuntze K 100 W PR herunter. Dr. A. Kuntze K 100 W PR 20 Seiten. Measuring and control instruments for ph and orp measurement
2.3 Installation K 100 W
2.3 Installation K 100 W
Unscrew the
terminal cover.
Drill three holes (max. M5)
according to the drawing.
Mind that there are two
ways for installation: (1) You
can hang the instrument
upon the upper screw. In
that case drill the upper
hole 120mm above the
lower two. (2) Or you can
slip the fixture on the back
of the instrument under the
upper screw. In that case
the upper hole has to be
another 15mm higher.
Insert the upper screw and
make sure to leave at least
3 mm between wall and
screw head for the fixture.
Mount the instrument and
fix it with the two lower
screws. Close the terminal
cover or start with the
connections.
K 100 PR & K 100 W PR
12