Draper Acumen Recharge V Anleitung Installation & Betrieb - Seite 3
Blättern Sie online oder laden Sie pdf Anleitung Installation & Betrieb für Projektionsfläche Draper Acumen Recharge V herunter. Draper Acumen Recharge V 12 Seiten. Battery operated electric projection screen
Acumen
Recharge E & V
™
Section 2 - Fascia Removal
MUST BE DONE PRIOR TO REMOVAL OF SHIPPING BRACKETS
To remove fascia:
1. Remove the screws from bottom lip at each end
of the fascia using 3/32" hex wrench.
2. Lift fascia off of the top lip of the case spine extrusion.
To install fascia:
1. Hook the top lip of fascia over the top lip of spine extrusion.
2. Push bottom edge of fascia towards the case spine.
3. Align holes in fascia with end cap holes and screw in the attachment screw using 3/32" hex wrench.
1
Figure 1-B
Section 3 - Removing Shipping Brackets
Screen should not be operated until after
dowel shipping brackets are removed
Please Note: Before fully operating screen: lower viewing surface enough to fully
expose shipping brackets, then remove shipping brackets See Fig. 2.
SCREEN
DOWEL
2
Remove ½"
carriage bolts
brackets to the roller brackets.
1
(Tab-Tensioned Screens Only)
BACK VIEW
hex bolts
and
(13mm)
securing
"green"
2
Figure 1-A
2
Figure 2
1
Remove ½"
securing
to the
attached to dowel.
SCREEN
DOWEL
3
Lower screen surface down some
and remove the
"gold"
from the dowel.
Retighten the
dowel screws.
page 3 of 12
3
R o lle r
FRONT VIEW
hex bolts
(13mm)
"green"
brackets
"gold"
brackets
BACK VIEW
4
Retighten
Dowel Screws
brackets
and repeat on the other
end of the screen dowel.
S C R E E N
D O W E L