Draper Ultimate Access XL V Anleitung Handbuch - Seite 4

Blättern Sie online oder laden Sie pdf Anleitung Handbuch für Projektionsfläche Draper Ultimate Access XL V herunter. Draper Ultimate Access XL V 7 Seiten. 220v electric projection screen
Auch für Draper Ultimate Access XL V: Anleitung Installation & Betrieb (7 seiten)

Draper Ultimate Access XL V Anleitung Handbuch
Ultimate Access XL E & V
Electric Projection Screen

Section 6 - Operation

Caution: When operating for the first time, cycle unit down and up several times to confirm satisfactory operation. Be prepared to cut POWER if necessary.
• 110-120V SINGLE STATION CONTROL - 3-position UP-OFF-DOWN switch permits operation to be stopped at any point. Factory adjusted limit switches
automatically stop screen when fully down or fully up.
• 110-120V MULTIPLE STATION CONTROL - Switches are similar in appearance to 110-120V Single Station Control. Screen stops when switch is released and
may be restarted in either direction. Factory adjusted limit switches stop screen automatically when fully up or fully down.
• 24V CONTROL - 3-button UP-STOP-DOWN switches stop at any point desired, operate in any sequence. Factory adjusted limit switches automatically stop
screen when fully up or fully down. Installer should incorporate an all-pole disconnect in fixed wiring available with RF or IR remote.
• KEY OPERATED SWITCHING - Two key-operated switches optionally available with this unit:
• Key-operated power supply switch controls power to screen and switches. When "off", switches will not operate screen. Key may be removed from
switch in either "on" or "off" position.
• Three-position key switch permits the screen to be operated directly by key. Requires screen operator to have a key.
• RS232 / ETHERNET - Serial communication and network communication optionally available.
Section 7 - Tab-Tension Adjustment Procedure
Please Note: Draper's Tab-Tensioning System is factory-set, and under normal
circumstances will not require field adjustment.
If wrinkles are observed, however, follow the adjustment procedure
shown in Figure 8.

Section 8 - Electrical Connections

1. Screen operates on 110-120V, 60 Hz., 1.1 amp current draw.
2. Junction box is located just above the bottom access panel at the left end of the screen.
3. Open the access panel/trap door for access to the junction box cover.
4. Remove two
(2)
hex head screws that secure the cover to the junction box to expose the red, black, and white pigtail leads and the green ground wire per wiring
diagram
(Page
7).
5. If optional low voltage control or video interface control is specified and factory installed, please refer to wiring diagram
6. Screen is shipped with internal wiring complete and control
be furnished by installer. Connections should be made in accordance with attached wiring diagram, and wiring should comply with national and local electrical
codes.
7. All operating switches should be "off" before power is connected.
Figure 8
(See bottom access panel/trap door opening and closing instructions
switch(es)
fully boxed. Wire to connect screen to
END OF
DOWEL
PUSH & TURN
PUSH & TURN
COUNTER-CLOCKWISE
CLOCKWISE
to RELEASE TENSION
to INCREASE TENSION
(Page
7).
switch(es)
and
switch(es)
page 4 of 7
END OF
DOWEL
below).
to power supply should