Draytek Vigor2865 Series Schnellstart-Handbuch - Seite 2
Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Netzwerk-Hardware Draytek Vigor2865 Series herunter. Draytek Vigor2865 Series 3 Seiten. Vdsl 35b security firewall
Auch für Draytek Vigor2865 Series: Schnellstart-Handbuch (19 seiten), Schnellstart-Handbuch (17 seiten)
Hereby, DrayTek Corporation declares that the equipment type Vigor2865 is in compliance with The Electromagnetic
Compatibility Regulations 2016 (SI 2016 No.1091), The Electrical Equipment (Safety) Regulations 2016 (SI 2016 No.1101),
and The Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment Regulations 2012
(SI 2012 No. 3032).
The full text of the UKCA Declaration of Conformity is available at the following internet address:
https://fw.draytek.com.tw/Vigor2865/Document/CE/
Product name:
VDSL Security Firewall
Model number:
Vigor2865
Manufacturer:
DrayTek Corp.
Address:
No.26, Fushing Rd., Hukou, Hsinchu Industrial Park, Hsinchu 303, Taiwan
Hereby, DrayTek Corporation declares that the equipment type Vigor2865 is in compliance with EU EMC Directive
2014/30/EU, Low Voltage Directive 2014/35/EU and RoHS 2011/65/EU.
The full text of the EU Declaration of Conformity is available at the following internet address:
https://fw.draytek.com.tw/Vigor2865/Document/CE/
Product name:
VDSL Security Firewall
Model number:
Vigor2865
Manufacturer:
DrayTek Corp.
Address:
No.26, Fushing Rd., Hukou, Hsinchu Industrial Park, Hsinchu 303, Taiwan
H
a
r
d
w
a
r
e
I
n
H
a
r
d
w
a
r
e
I
n
1.
Connect the DSL interface to the land line jack with a DSL line cable, or
Connect the cable Modem/DSL Modem/Media Converter to the WAN port of router with
Ethernet cable (RJ-45).
2.
Connect one end of an Ethernet cable (RJ-45) to one of the LAN ports of the router and the
other end of the cable (RJ-45) into the Ethernet port on your computer.
3.
Connect one end of the power
adapter to the router's power
port on the rear panel, and the
other side into a wall outlet.
4.
Power on the device by pressing
down the power switch on the
rear panel.
5.
The system starts to initiate.
After completing the system
test, the ACT LED will light up
and start blinking.
s
t
a
l
l
a
t
i
o
n
s
t
a
l
l
a
t
i
o
n
Declaration of Conformity
EU Declaration of Conformity