Drazice BTO 10 UP Anleitung Handbuch - Seite 5
Blättern Sie online oder laden Sie pdf Anleitung Handbuch für Warmwasserbereiter Drazice BTO 10 UP herunter. Drazice BTO 10 UP 8 Seiten.
yellow-green protective conductor on minimum section 4 mm2. Access to the electric part of the heater is enabled only
upon disconnecting the heater from power supply and unscrewing the guard of the heater.
The degree of protection of electric parts of the heater is IP 24.
Respect the rules of protection against electricity injuries in accordance with ČSN 33 2000–4-41.
9. HEATER COMMISSIONING
Once connected to the water supply, the heater can be put in service.
Procedure:
a) check the power and water main installation
b) open the hot water valve on the combination faucet
c) open the cold water inlet valve to the heater.
d) as soon as the water starts running through the hot water valve, the heater is filled and the valve closes.
e) using the front-end main switch open electricity and thus the heater activates.
10. IMPORTANT NOTICE
Without a confirmation issued by an authorised company about performed electrical and plumbing fixture
−
the warranty certificate shall be void.
The hot water outlet must be equipped with a combination faucet.
−
It is not allowed to handle the thermostat in any manner whatsoever, aside from temperature resetting
−
with a control button.
All electric installation handling, adjustment and replacement of the regulation elements shall only be
−
performed by an authorised service company.
The thermal fuse must not be turned off. The non-reversible thermal fuse discontinues electric power input to the heating
element should the thermostat fail, if the water temperature in the heater exceeds 99°C.
Disposal of packaging material and functionless product
A service fee for providing return and recovery of packaging material has been paid for the
packaging in which the water heater was delivered.
Was paid pursuant to Act No. 477/2001 Coll., as amended, at EKO-KOM a.s. The client
number of the company is F06020274. Take the product packages to a waste disposal place
designated to that purpose by the municipality. When the operation terminates, disassemble
and transport the discarded and unserviceable heater to a waste recycling centre (collecting
yard), or contact the manufacturer.
5