Drazice OKCE 160 NTR Betriebs- und Installationshandbuch - Seite 11

Blättern Sie online oder laden Sie pdf Betriebs- und Installationshandbuch für Boiler Drazice OKCE 160 NTR herunter. Drazice OKCE 160 NTR 19 Seiten. Tank-type water heater for vertical mounting
Auch für Drazice OKCE 160 NTR: Betriebs- und Installationshandbuch (18 seiten), Betriebs- und Installationshandbuch (13 seiten)

Drazice OKCE 160 NTR Betriebs- und Installationshandbuch
It is necessary to check the safety valve each time before putting it into operation. It is checked
by manual moving of the membrane from the seat, turning the make-and-break device button
always in the direction of the arrow. After being turned, the button must click back into a notch.
Proper function of the make-and-break device results in water draining through the safety valve
outlet pipe. In common operation, such a check needs to be implemented at least once a month,
and after each heater shutdown for more than 5 days. Water may be dripping off the drain pipe
of the safety valve; the pipe must be open into the air, pointed down; environment
temperatures must not drop below zero.
Find necessary pressure values in the below. (Table 4)
Heaters must be provided with a discharge valve mounted on the cold service water inlet to the heater
for potential disassembly or repair. When assembling the security equipment, follow the standard.
Figure 6
SAFETY VALVE
START-UP
PRESSURE
[MPa]
0.6
0.7
1
Figure 7
ALLOWABLE
MAXIMUM
OPERATING
PRESSURE IN
OVERPRESSURE
COLD WATER
OF WATER
PIPES [MPa]
HEATER [MPa]
0.6
up to 0.48
0.7
up to 0.56
1
up to 0.8
Table 4
- 11 -