Anchor Navi-Trac LT/CS Installationsanleitung Handbuch - Seite 14
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Zelt Anchor Navi-Trac LT/CS herunter. Anchor Navi-Trac LT/CS 16 Seiten. Pavilion 12' to 24' projection
Step 8 - Fastening Frame to Existing Building
•
At back of pavilion, adjust the frame attaching bracket so that is is fi tted up to existing building.
•
Customer must determine and install the type of device that is best suited to attach frame to existing building.
Connection to existing building
must be determined by cus-
tomer.
U-Shaped stabilizer may not be
used at corner uprights due to
fabric interference.
Frame Attaching Bracket
14