Anchor Navi-Trac LT/CS Installationsanleitung Handbuch - Seite 14

Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Zelt Anchor Navi-Trac LT/CS herunter. Anchor Navi-Trac LT/CS 16 Seiten. Pavilion 12' to 24' projection

Step 8 - Fastening Frame to Existing Building
At back of pavilion, adjust the frame attaching bracket so that is is fi tted up to existing building.
Customer must determine and install the type of device that is best suited to attach frame to existing building.
Connection to existing building
must be determined by cus-
tomer.
U-Shaped stabilizer may not be
used at corner uprights due to
fabric interference.
Frame Attaching Bracket
14