Dreamline AQUA PLUS Installationshandbuch - Seite 2

Blättern Sie online oder laden Sie pdf Installationshandbuch für Armaturen für das Badezimmer Dreamline AQUA PLUS herunter. Dreamline AQUA PLUS 7 Seiten. Shower / tub door

Preparation
1. After opening the boxes, read this introduction carefully, check all the packed parts are
complete by cross checking all the components against the "Detailed Diagram of
Shower Door Components". Examine for shipping damage. If the unit has been
damaged or has a finishing defect, please contact your local distributor within 3
business days. Please note that Bath Authority
damaged product or parts free of charge after 3 business days or if the product
has been installed. Contact your distributor or DreamLine if you have any questions.
2. Please note that you should consult your local building codes on questions on
installation compliance standards. Building and plumbing codes vary by location,
and DreamLine is not responsible for code compliance standards for your project.
3. Please ensure that prior to the installation the floor is leveled and solid. Also make sure
the walls are at right angles. While some adjustment in leveling of the door is possible,
irregular floor level or improper angle of side walls will result in serious problems for
your installation. Please note that there are some adjustments and drilling might be
necessary during the installation process.

Tools Required

Rev 2.1
TM
TM
/ DreamLine
will not replace any
2