Anderson ANM76 Betriebshandbuch - Seite 8
Blättern Sie online oder laden Sie pdf Betriebshandbuch für Brenner Anderson ANM76 herunter. Anderson ANM76 13 Seiten.
10. Burner Installation
Check before mounting:
–
Burner body modules are connected securely with no obstruction.
–
Remove dust and other particles inside burner if any
–
Check if any obstructions in burner air duct
–
Gaskets between burner and duct flanges
–
Check alignment of system.
–
Install UV-scanners on burner
11. Burner start
Special attention:
The ANM76 Series burners, described herein, are designed to mix fuel with ai. All fuel
burning devices are capable of producing fires and explosions, if improperly applied,
installed, adjusted, controlled, or maintained. Do not bypass any safety logics; Never try
to light a burner if it shows signs of damage or malfunction.
11.1 Pre-commissioning Requirements
Gas supply pipework up to the isolating ball valve should be pressure tested and
purged.
Gas to be available at a pressure between 80% and 100% of supply pressure at system
inlet.
If pneumatic shut off valves are used, make sure the compressed air inlet pressure is
at least 4.0 bar.
Electrical supply to the Burner Management System should be supplied at specified
voltage and frequency.
All field wiring from the burner management panel to the equipment should be
installed and tested according to the wiring diagrams.
All three phase power cables to electrical motors should be installed. Combustion air
fan, auxiliary air fan should be checked for correct rotation direction. Thermal overload
devices should be preliminary set.
Process air temperature should follow this manual technical description. The
mentioned process flow should be available for extended periods adequate for burner
commissioning to continue. Make sure no impurities flow into the combustion air
chamber.
11.2 Commissioning Procedure
1.
Visual inspection of the burner equipment, paying particular attention to the
support structure of the gas pipe work. Inspect internal duct, looking for
mechanical damage to the burner.
2.
Set and adjust the position of the auxiliary profile plate of process air across burner,
measure the pressure in the air duct with a pressure gauge, and ensure that the
DP before and after the profile plate reaches the required value, thereby
determining the maximum position of the profile plate. In actual operation, the
differential pressure switch is usually set to detect the process air pressure
Anderson Thermal Soluions(Suzhou)Co., Ltd
Anderson Thermal Solutions – ANM76 Burner Operation Manual
6
Curve