Compac ComTank Installationsblatt - Seite 17
Blättern Sie online oder laden Sie pdf Installationsblatt für Spender Compac ComTank herunter. Compac ComTank 18 Seiten.
Installation Checklist
Installation Checklist
Version 1.0.0.
ComTank.
Site number and name:
Date:
Installer name and phone number:
Serial number:
When a new unit is being installed use the following checklist to make sure the unit is fully operational. Check each box
or write N/A where not applicable. Refer to the relevant installation manual for procedures.
Mechanical
Checks
Check unit is undamaged and has not been tampered with.
Is the unit in a sheltered position and facing away from the prevailing wind and rain?
Check all panels are securely fastened using tamper-proof fastenings where
supplied.
Check that all cable entries to unit are through glands and unused glands are
sealed.
Power on
Checks
Check that the CE board, FMS board, pinpad, printer, cardreader, router and
modem all power up.
Check pumps are re-priced to the current fuel price.
Check that different fuels are correctly priced on all hoses.
Transaction
Checks
Complete transaction using white card/CWID/HID/Pin authorisation methods
Check that all hoses can be selected and authorised by the unit.
USB Module
Checks (where
fitted)
Check the supplied USB key is recognised by the unit.
Select "Get Transactions" and check that transactions are uploaded to the USB key.
Compac Industries Ltd.
Page 17
Checking Transactions are Uploaded
Yes
Yes
Yes
Yes
www.compac.co.nz
No
No
No
No