Electrolux C260 Betriebs- und Installationshandbuch - Seite 10
Blättern Sie online oder laden Sie pdf Betriebs- und Installationshandbuch für Lüftungshaube Electrolux C260 herunter. Electrolux C260 20 Seiten. Hydro-extractor
Auch für Electrolux C260: Betriebshandbuch (24 seiten), Service-Handbuch (41 seiten)
- 1. Table of Contents
- 1. Instruction for Use
- 1. General, Safety
- 1. Procedure for Use
- 1. Maintenance
- 1. Unpacking, Open the Lid, Come with All Types
- 1. Positioning, Drains
- 2. Electrical Installation
- 2. Voltage Change
- 2. Test Runs
- 2. Installation
- 2. Quality Requirements, Concreting of Foundation
- 2. Concreting, Procedure
- 2. Attachment and Fitting of Hydro-Extractor
- 2. Technical Data
10
Installation of all types of hydro-extractor
Quality requirements concerning the base
The base must be very stable in order to absorb
the dynamic forces transferred in the spinning
process.
Normally, the hydro-extractor can be attached by
means of expansion bolts (size M12) directly into
a concrete floor of good quality and adequate
thickness - see bolt height B in the table below;
or the enclosed foundation bolts can be cast into
the floor, see procedure next page.
Concreting of foundation for all types of
hydro-extractor
If there is uncertainty as to the quality of the
floor, or if the working height of the hydro-
1
extractor is too low, it could be a good idea to
build up a concrete foundation. This foundation
should have a height of approx. 100 mm and its
minimum dimensions should be as stated in the
table.
Type of hydro-extractor
A
B
freely suspended basket
B
rigidly suspended basket
Bolts for freely suspended basket
Bolts rigidly suspended basket
Installation
1
38 litres
600 mm
32 mm
60 mm
3 pcs.
3 pcs
A
A
58 litres
88 litres
700 mm
800 mm
32 mm
45 mm
55 mm
4 pcs
4 pcs
4 pcs
487 22 52 21 - Cent. 240, 260, 290, GB
B