Atlantic O'Pro 272014 Installations- und Betriebshandbuch - Seite 6

Blättern Sie online oder laden Sie pdf Installations- und Betriebshandbuch für Warmwasserbereiter Atlantic O'Pro 272014 herunter. Atlantic O'Pro 272014 17 Seiten. Premium series mains pressure electric storage water heaters

Atlantic O'Pro 272014 Installations- und Betriebshandbuch
result of both water expansion during heating and also pressure
fluctuations.
The supplied PTR valve must be fitted with Teflon tape. Do not use paste
or hemp.
 
DN15 copper drain lines must be connected to the discharge pipe of the
PTR valve. The copper drain line must fall away from the ESWH and
be installed in a frost- free environment.
The termination point of a drain line must comply with the requirements
of AS/NZS 3500.4
 
WARNING: The Pressure Temperature Relief valve and drain line must
not be sealed or blocked.

Electric Connection

All electrical work must be carried out by a registered electrician and in
accordance with AS/NZ 3000.
The Atlantic ESWH must be filled with water before connection to a
power supply.
Switch off the power before removing the cover to avoid any risk of injury
or electric shock.
The installation must be equipped, upstream of the appliance, with
a bipolar cut-out device (fuse, breaker switch) respecting local
regulations (30 mA earth-leakage breaker).
Always connect the earth conductor of the cable to the earth ground
wire or connect the earth conductor to the appropriate terminal
identified by the symbol.
6