Atlantic SP1600 Gebrauchsanweisung - Seite 8
Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Rasen- und Gartengeräte Atlantic SP1600 herunter. Atlantic SP1600 16 Seiten. Oasis series skimmer, filterfalls, pump vault, fastfalls
Auch für Atlantic SP1600: Produkthandbuch (12 seiten)
PLUMBING THE PS3900
The PS3900 Skimmer has pump discharge
step fittings molded into each side of the
skimmer enclosure. The step fittings are
labeled for 1 ½" or 2" PVC pipe and have
cut lines molded in for each size (Figure 9).
Choose the step fitting on the side of the
skimmer that will be best suited to exit based
on this installation. Using a PVC saw or
standard hack saw, remove the end of the
step fitting (making sure to follow the molded
cut line) for the size pipe used for this water feature. Once completed, push one end of the
PVC supply line through the step fitting allowing approximately 10" of pipe to enter the
skimmer enclosure.
It is recommended that you install a TR215CV Triton Check Valve between the pump and the
supply line. This valve will prevent the FilterFalls from draining when the pump is off, which
keeps the beneficial bacteria alive and any debris that the FilterFalls has collected from back
flowing into your pond. Refer to the Triton Check Valve installation instructions on page 15
for further details.
A drill point is provided on both sides of your Oasis Skimmer to show the proper location
for the installation of an AF1000 Auto Fill valve (not included). See the Auto Fill installation
instructions on page 16 for more information. There is a drill-point provided on the back of
Oasis Skimmer to show the proper location and elevation for the installation of an overflow
(not included). See the Overflow installation instructions on page 16 for more information.
Oasis FilterFalls Installation
BULKHEAD INSTALLATION
It is a good idea to install the bulkhead fitting and 1 ½" MTA (included) before setting
the BF1600. If 2" flexible PVC is being used for the supply line, replacing the 1 ½" HA1550
bulkhead with an Atlantic 2" HA2000 bulkhead (not included) is recommended.
Remove the retaining nut and plastic friction washer, leaving the rubber gasket on the
body of the bulkhead fitting. Note that the retaining nut is reverse threads. Turn clockwise
to loosen.
From the inside of the FilterFalls, insert the threaded end of the bulkhead into the hole on
the back of the enclosure. This will sandwich the rubber gasket between the flange of the
bulkhead and the inside wall of the enclosure. Slip the friction washer over the threaded
end of the bulkhead on the outside of the enclosure and install the retaining nut. Tighten
the retaining nut by hand and then finish off with a half turn from a wrench. Note that the
retaining nut is reverse threads. Turn counterclockwise to tighten.
SETTING THE BF1600
It is always recommended that the FilterFalls be placed on undisturbed soil if possible. If
the installation calls for the FilterFalls to be elevated above existing grade, it is critical to
compact the area thoroughly. This will ensure that the FilterFalls will not settle out-of-level
over time. The use of cinder blocks or bricks under the falls to raise it up will help reduce
the chance of settling.
The FilterFalls can be placed adjacent to the pond edge to create a single waterfall, or
pulled away from the pond to create a streambed effect. Refer to the surface area
recommendations on page 4 to ensure that the streambed is properly sized.
8
Figure 9.