4.0 DELIVERY/OFF-LOADING
It is recommended that the STANDARD electric boiler is
transported and, if necessary, stored on the pallet on which
it is delivered from the factory.
If temporarily stored, the surroundings should be
maintained at temperatures below 80°C, and without
condensation at relative humidities between 30% and 80%
Manhandling the STANDARD electric boiler into position
requires :-
(a) Qualified, skilled manpower
(b) Use of a pallet trolley or a fork lift truck
(c) Use of the lifting eyes provided on the boiler and tested
of lifting beams
5.0 MAINTENANCE
Effective maintenance must aim at preventing :-
a). a reduction in the movement of water circulation through the boiler - this can result in the
formation of sediment or limescale on the boiler immersion heater elements
b). pockets of high temperature water across the boiler immersion heater
elements – resulting in their destruction by overheating
c). accumulation of sediment or limescale within the boiler, particularly on
or around the boiler immersion heater elements – overcoming these developments by the
introduction of fresh, clean water without any inhibitor or de-scaling agent
Minimum maintenance periods
A) Monthly maintenance
i) Check operation of the automatic air vent
ii) Check operation of the water flow switch
iii) Check operation of the safety valve
B) Annual maintenance
i) Carry out the monthly checks
ii) Check all the electric control functions
iii) Check all pipework joints are water-tight
iv) Drain off small amount of boiler water content and check for condition
C). 4-yearly maintenance
i) Carry out the annual maintenance
ii) Isolate the boiler safely from all services
iii) Drain the boiler of water and open up for inspection
iv) Check for all maintenance requirements and remedy as necessary
v) Close and seal the boiler, fill with fresh clear water through drain outlet
vi) Pressure test, then repeat annual maintenance procedure
16
4) DELIVERY and OFF-LOADING
It is recommended that the STANDARD electric boiler is transported and, if necessary,
stored on the pallet on which it is delivered from the factory.
If temporarily stored, the surroundings should be maintained at temperatures below
80degC, and without condensation at relative humidities between 30% and 80%
Manhandling the STANDARD electric boiler into position requires :-
(a)
Qualified, skilled manpower
(b)
Use of a pallet trolley or a fork lift truck
(c)
Use of the lifting eyes provided on the boiler and tested of lifting beams