drexel und weiss aerosilent topo Betrieb, Wartung, Inbetriebnahme - Seite 17

Blättern Sie online oder laden Sie pdf Betrieb, Wartung, Inbetriebnahme für Bedienfeld drexel und weiss aerosilent topo herunter. drexel und weiss aerosilent topo 20 Seiten.

The nominal air quantity only needs to be set for fan level 2. The air quantity for fan level
1 and fan level 3 is calculated automatically as -30% and +30% respectively.
Example: Nominal air quantity, 80 m³/h, 5=OFF, 6=OFF, 7=OFF, 8=OFF

Setting the fan balance

DIP switches 3 and 4 are used to set a higher air quantity for the supply air fan in compa-
rison to the extract air fan.

Switching point for frost protection heating (FSH)

The FSH switching point can be set between -5°C and 0°C using the potentiometer on
the controller board.
FSH switching point:
Left stop / - 5°C
Right stop / 0°C
Operating, Maintenance, Commissioning
Page 17