Dromone Multi-Lock Quick Coupler Benutzerhandbuch - Seite 11

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Bagger Dromone Multi-Lock Quick Coupler herunter. Dromone Multi-Lock Quick Coupler 18 Seiten. Excavator automatic quick coupler

Dromone Multi-Lock Quick Coupler Benutzerhandbuch
6. When both attachment pins are seated
in the 'MULTI-LOCK Quick Coupler' jaws,
rotate the attachment fully inwards using
the excavator bucket cylinder (
This manoeuvre will ensure that the at-
tachment is fully seated in the 'MULTI-
LOCK Quick Hitch' jaws.
7. Press 'POWER' button the indicator
light will go out and audible buzzer will
stop sounding in excavator cab. The
main cylinder will extend and lock the
latching hooks over the attachment pin.
Fig 9. Curling fully inwards and ap-
ply overpressure for 3-5 seconds
8. As a final check that this procedure
has been carried out correctly, the fol-
lowing checks should be verified in the
following order.
1. Visually confirm rear latch is en-
gaged
2. Complete bump test to ensure
that rear lock is properly secure
3. Visually confirm the front lock is
engaged
With the confirmation of these checks
the coupler is now ready for use. (
10)
QMS 22
REV: D - JAN2012
Dromone Multi– Lock Quick Coupler
Figure 7)
.
Figure
Dromone Multi– Lock Quick Coupler
11
1. Visually confirm rear latch
2. Complete
bump test to
ensure that rear
lock is properly
secure
Fig 10. Final checks
3. Visually confirm the
front lock is engaged
Author:EOD
Approved:MS