Daikin EKLD90P12 Gebrauchsanweisung - Seite 3
Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Kühler Daikin EKLD90P12 herunter. Daikin EKLD90P12 4 Seiten.
EKLD90P12
EKLD90P18
I
NTRODUCTION
This kit is an obligatory option especially designed for ensuring
optimum operation of the system in case the outdoor unit is installed
between 50 and 90 m above the lowest indoor unit.
C
ONTENT OF THE KIT
The kit includes all necessary parts and instructions for building the
difference in height installation kit into the outdoor unit. See
N
ECESSARY TOOLS FOR PROCESSING
EKLD90P12
1
Brazing equipment
2
Wire cutter
3
–
I
NSTALLATION PROCEDURE
Follow procedure steps as visualized in figures and as listed in table
below.
Make sure to permanently cool the liquid stop valve when
brazing.
EKLD90P12
See
figure
2.
1
Braze the standard installed
pinched pipe loose from the
tube that is brazed to the liquid
side stop valve.
2
Position the option kit behind the compressor as indicated in the
illustration.
3
Match the pipe-end at the
position where the pinched pipe
was brazed loose.
4
Match the non-return check valve (insulated part) and filter part of the
option kit against the insulation on the 2-way suction pipe behind the
compressor.
Fix the option part (both the non-return check valve and the filter
together) against the insulation on the 2-way suction pipe by firmly
strapping the 2 parts with the supplied tie-wrap as illustrated.
5
Perform brazing of the option kit.
I
MPACT OF THIS KIT ON STANDARD
INSTALLATION PROCEDURES
Installation of this kit requires that the size of the main
liquid pipe be increased.
The obligatory installation of this kit has no impact on:
Connection ratio of total allowed indoor unit capacity;
Equivalent pipe length between outdoor and indoor units;
Automatic charging of refrigerant;
Leak detection function;
Indoor unit installation conditions and the required field settings
resulting from these conditions.
EKLD90P12+18
4PW34861-1A
Difference in height installation kit up to 90 m
figure
EKLD90P18
Brazing equipment
Wire cutter
Pipe cutter
EKLD90P18
See
figure
3.
1
Cut the standard installed liquid
pipe at the specified length
beneath the liquid side stop
valve as indicated in the
illustration.
3
Match the pipe-end at the
position where the liquid pipe
was cut.
N
OTES
1.
Instruction manual
1