Daintree GE Current Arize Factor Installationshandbuch - Seite 4
Blättern Sie online oder laden Sie pdf Installationshandbuch für Beleuchtungsanlagen Daintree GE Current Arize Factor herunter. Daintree GE Current Arize Factor 10 Seiten. Horticulture led lighting system
Arize
Factor
®
ML Series Rolling Rack Mount
ML900 Rolling Rack Mount, 48"
Power Input/Output
After the horizontal bracket is attached to the strut, secure the bracket to the strut by tightening the two
screws located at each end of the bracket.
ML300 Rolling Rack Mount, 24"
After the horizontal bracket is attached to the strut, secure the bracket to the struts by tightening the two
screws, located each end of the bracket.
Driver
Power Input/Output
Mounting Brackets
Driver
4
Mounting Brackets
Tighten screws, both sides
Lightbars
Tighten screws, both sides
Lightbar
Installation Guide