3nStar PTE0110 Benutzerhandbuch - Seite 4

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Touch-Terminals 3nStar PTE0110 herunter. 3nStar PTE0110 14 Seiten. Point of sale system

Initial Installation

1. Unpacking
Immediately after the receipt of the machine is unpacked, in the case of there being damage,
make sure to report it to the shipping company and they will immediately report the claim to
the manufacturer. After unpacking, check if the spare parts are complete.
2. Preparing for Installation
Examine the case for cleanliness, signs, marking, and if labeling is correct. Check the working
environment because the cash register is a precision instrument and should be checked before
using the surrounding environment so that it meets the technical specifications of the cash
register. If inconsistent with the specifications, please do not use the cash registers.
3. The main technical specifications
Power supply voltage: 220VAC~ ± 15%
Power: 80W ± 15%
Temperature Operating: 0 ℃ ~ 40 ℃
Frequency: 50—60Hz
Storage: -20 ℃ ~ +55 ℃
Relative humidity: 20% ~ 93% (40 ℃)
4. Preparing for use
When placing the machine, please make note of the cable line to ensure that the wires are
fluent.
Open the machine host power switch (note: we must ensure that there is a good power
supply ground).
System installation (cash registers at the factory with only the DOS operating system and
customers using a genuine Windows operating system before installation).
To perform some general sales operations, check monitors, printers, cash drawers and other
peripherals to ensure that they're working properly.
2
PTE0110 User Manual