3onedata ICS5530-16GS8GC6XS-2P220 Handbuch zur Schnellinstallation

Blättern Sie online oder laden Sie pdf Handbuch zur Schnellinstallation für Schalter 3onedata ICS5530-16GS8GC6XS-2P220 herunter. 3onedata ICS5530-16GS8GC6XS-2P220 3 Seiten. Industrial layer 3 ethernet switch
Auch für 3onedata ICS5530-16GS8GC6XS-2P220: Handbuch zur Schnellinstallation (3 seiten)

3onedata ICS5530-16GS8GC6XS-2P220 Handbuch zur Schnellinstallation
ICS5530 Series
Industrial Core Layer 3 Ethernet
Switch
Quick Installation Guide
3onedata Co., Ltd.
Address:
3/B, Zone 1, Baiwangxin High Technology
Industrial Park, Song Bai Road, Nanshan
District, Shenzhen, 518108, China
Website:
www.3onedata.com
Tel:
+86 0755-26702688
Fax:
+86 0755-26703485
【Package Checklist】
Please check the integrity of package and accessories while
first using the switch.
1. Industrial Ethernet switch
2. Serial port line
3. Power line x2 (AC products only)
4. Foot pad x4
5. Rack-mounting lug x2
6. Warranty card
7. Certification
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.
【Product Overview】
This series are managed industrial Ethernet switches. The
models are:
Model I: ICS5530-16GS8GC6XS-2P220 (6 10GbE SFP
(10Gigabit/Gigabit self-adaption) + 8 Gigabit
combo+16
Gigabit
SFP,
redundant power input)
Model II: ICS5530-16GS8GC6XS-2P
(10Gigabit/Gigabit self-adaption) + 8 Gigabit
combo+16 Gigabit SFP, 18~72VDC redundant
power input)
【Panel Design】
Front panel
Model I, Model II
Rear panel
Model I
Model II
1.
Ethernet port indicator
2.
Gigabit Ethernet SFP
3.
1000M Combo port
4.
10
Gigabit
SFP
+
port
self-adaption)
5.
Console port
6.
Power indicator (P1/P2)
7.
Alarm indicator
8.
Device running status indicator
9.
Restoring factory setting button
10. Lugs
11. Relay output terminal blocks
12. AC power input
13. Grounding screw
14. DC power input
100~240VAC
/DC
【Mounting Dimension】
Unit: mm
(6
10GbE
SFP
(10Gigabit
/
Gigabit
【Install Rack-mounted Device】
This product adopts rack-mounting, mounting steps as
below:
Step 1
Step 2
Notice before Mounting:
Don't place or install the device in area near water or
moisture, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before powering on the device, check the power
specifications supported by the device to prevent
device damage due to overvoltage.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
Select the device mounting location to ensure
enough size.
Adopt 4 bolts to install the mounting lugs in the
device position as figure below.