AddEnergie CoRe+PSV2 Installationshandbuch - Seite 9
Blättern Sie online oder laden Sie pdf Installationshandbuch für Batterieladegerät AddEnergie CoRe+PSV2 herunter. AddEnergie CoRe+PSV2 14 Seiten.
Wall or Post Mounting
Power cable entry from the back
• IMPORTANT, never
remove the protection
plate of the keyhole.
• Attach the head base to
the wall or the post with
appropriate type of anchors
• Hang the head base to an
anchor (previously fixed
to the wall or post) via
the keyhole at the top.
NEVER REMOVE THE
PROTECTION PLATE
• Complete the mounting of
the head base by installing
an anchor through the
bottom hole.
2016 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED. Information and Specifications Contained in this Document are Subject to Change, Amendments, and Additions at any Time, Without Notice
• Remove the plate to avoid the splatter of
particles in the equipment.
• Punch a hole of the appropriate diameter to
install the cable connector.
• Replace the plate in place.
GND
• Install the cable connector
to the punched hole, then
the cable. Make sure the
conductors are long enough to
reach the terminal block.
L1 L2
• Connect two power
conductors (L1 and
L2) and the ground
conductor (GND)
• The grounding
conductor shall be
provided with green
or green and yellow
insulation.
9