AddEnergie SmartTWO Installationshandbuch - Seite 12

Blättern Sie online oder laden Sie pdf Installationshandbuch für Batterieladegerät AddEnergie SmartTWO herunter. AddEnergie SmartTWO 20 Seiten.
Auch für AddEnergie SmartTWO: Schnellstart-Handbuch (4 seiten)

Wall Mount

Single unit installation
No
Description
Qté
1
Structure principale
1
2
Panneau frontal
1
3
Couvercle du bornier
1
Nbr
Description
Qty
1
1
Main Structure
2
1
Front Panel
3
1
Block Cover
2
Montage du côté gauche
Left side mounting
© 2019 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice
1
3
SPECIAL NOTES:
• The EVSE has been assembled at the factory to point toward the right
side, assuming that it will be installed on the left corner of the parking
stall.
• To install on the right corner of the parking stall, the nuts and bolts
attaching the back of the base to its inner frame shall be transferred from
one side to the other as shown on the pictures.
• Make sure you put both longer bolts at the position closest to the terminal
block.
INSTRUCTIONS:
• Make sure that the available height is a
minimum of 216 cm (85")
• If the wall requires that anchors to be pre-
installed, follow the drilling pattern provided
on right
• Install the base on the wall using the proper
type of anchors, which means ½-13 inserts
and bolts for a concrete wall, or ½ lag bolts
for a wooden wall.
• Before drilling and during the installation of the
base on the wall, make sure that everything is
leveled
Patron de perçage:
Drilling pattern:
8.3 cm
(3.25'')
21 cm
(8.25'')
74 cm
(29'')
SOL
GROUND
Montage du côté droit
Right side mounting
12