【LED Indicator】
IES5024-2F LED indictor light on the front panel .the function of each LED is described in the table as below.
System Indication LED
LED
State
PWR
ON
(green)
OFF
ON
SYS
(green)
OFF
Link/ACT
ON
(green)
Blinking
ON
【Installation】
Before installation, confirm that the work environment meet the installation require, including the power needs and abundant space. Whether it is close
to the connection equipment and other equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m) according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
power:DC 100~300V or AC 85~264V (47~63Hz)
environment:working temperature -20~60℃
Relative humidity 5%~95%
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and specification of cable match the requirement before cable laying;
2. It is needed to check the cable is damaged or not, factory records and quality assurance booklet before cable laying;
3. The required cable specification, quantity, direction and laying position need to match construction requirements, and cable length depends on
actual position;
4. All the cable cannot have break-down and terminal in the middle;
5. Cables should be straight in the hallways and turning;
6. Cable should be straight in the groove, and cannot beyond the groove in case of holding back the inlet and outlet holes. Cables should be
banded and fixed when they are out of the groove;
7. User cable should be separated from the power lines. Cables, power lines and grounding lines cannot be overlapped and mixed when they are in
the same groove road. When cable is too long, it cannot hold down other cable, but structure in the middle of alignment rack;
8. Pigtail cannot be tied and swerved as less as possible. Swerving radius cannot be too small (small swerving causes terrible loss of link). Its
banding should be moderate, not too tight, and should be separated from other cables;
9. It should have corresponding simple signal at both sides of the cable for maintaining.
Description
Power is being supplied to
power input PWR input
Power is not being supplied
to power input PWR input
System is running well
System is not running well
Port connection is active
Data transmitted
Port connection is not active