Duerkopp Adler 550-767 Installationsanleitung Handbuch - Seite 17
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Nähmaschine Duerkopp Adler 550-767 herunter. Duerkopp Adler 550-767 18 Seiten. Engineered work station for side airbag tearing seam
Auch für Duerkopp Adler 550-767: Montageanleitung (2 seiten)
6.
Sewing test
When setting-up is complete a sewing test must be carried out.
CAUTION: danger of injury!
The needle thread and hook thread must be threaded only when the
machine is turned off.
–
Thread the needle thread and hook thread.
–
Select the material to be processed.
–
Switch the machine on and set the required functions and values
on the control unit.
–
Carry out the sewing test slowly at first, then increase the speed.
–
Check that the seams satisfy requirements.
If not, carry out the adjustments and measures in the
Operating manual.
If necessary, carry out the the adjustments and measures detailed
in the Servicing manual.
2
13