Anzzi FIELD SP-AZ042 Handbuch installieren - Seite 6

Blättern Sie online oder laden Sie pdf Handbuch installieren für Sanitärprodukt Anzzi FIELD SP-AZ042 herunter. Anzzi FIELD SP-AZ042 16 Seiten.

INSTALLATION (SETUP)
Figure A
IMPORTANT
Before drilling any holes for the shower panel brackets, ensure there are no hidden cables or
pipelines aligned with the desired drilling position.
Step A
Drill the two holes for the top bracket 1" apart at the desired height.
Step A.2
Drill the two holes for the bottom bracket 1" apart at approximately 45" below the top bracket.
PERFECTION IS OUR TRADITION™
pg. 4