Anzzi SB-AZ011WC Handbuch für Installation und Betrieb - Seite 5
Blättern Sie online oder laden Sie pdf Handbuch für Installation und Betrieb für Sanitärprodukt Anzzi SB-AZ011WC herunter. Anzzi SB-AZ011WC 14 Seiten. Shower base
Auch für Anzzi SB-AZ011WC: Handbuch für Installation und Pflege (8 seiten)
INSTALLATION INSTRUCTIONS
ATTENTION
The following steps are for the corner
●
shower tray.
STEP 1
Ensure that the floor and the studs
●
are at right angles.Provide a 5"×5" opening
in the subfloor for the drain.
The 2" PVC waste pipe should extend above
the surface of the sub-floor according to the
drain installation instructions and the height
of the Shower Tray.
Mark unit position on floor and through
●
drain opening.
Mark the locations of the studs on the flange
●
of the base.
These marks are used to verify base location
●
after drain is installed. (Fig 1)
The pipe height (A) shall be determined
●
according to the products on hand.
STEP 2
Place the tray into the designated position
●
so that the Drain Body drops around the
Drain Pipe and put the Shower Tray up
against the studs.
Level the tray and place marks on the studs
●
above the upper edge of the tile flange.
If the subfloor is not flat and level, use leveling
●
compound or mortar bed to ensure that the
base is level (shown in Step 5).(Fig 2)
90°
90°
2" PVC Waste Pipe
(See Product Chart for Drain Location)
Fig. 1
Level base in two directions
Fig.2
5"
(12.7 cm)
A
90°
(5"×5") Opening
3