Danfoss VLT PROFIBUS DP MCA 101 Installationshandbuch - Seite 15
Blättern Sie online oder laden Sie pdf Installationshandbuch für Controller Danfoss VLT PROFIBUS DP MCA 101 herunter. Danfoss VLT PROFIBUS DP MCA 101 20 Seiten. In automationdrive fc 361
Auch für Danfoss VLT PROFIBUS DP MCA 101: Installationshandbuch (6 seiten)
Installation
®
Wiring procedure for VLT
DriveMotor FCP 106
1.
Mount the fieldbus connector on the fieldbus
option (terminals 62, 63, 66, and 67).
2.
Prepare the fieldbus cable by stripping a section
of the cable insulation, so that the cable screen is
in contact with the EMC bracket. Keep the
unshielded wire as short as possible. For cable
specifications, refer to chapter 3.7.2 Cable Specifi-
cations. For fieldbus cable requirements, see
chapter 3.7.3 Bus Segment Requirements.
3.
Connect the fieldbus cable wires to the terminals
according to the colour code of the wires, see
Illustration 3.10.
4.
To establish mechanical fixation and electrical
contact between cable screen and ground,
position the stripped cable between the spring
loaded metal clamps.
Illustration 3.13 PROFIBUS Wiring for FCP 106, MH1–MH3
MG33C602
Installation Guide
3.8 Reassembling Cover
1.
2.
3.9 Applying Power
Follow the instructions in the frequency converter
operating instructions to commission the frequency
converter. The frequency converter automatically detects
the PROFIBUS interface. A new parameter group (9-**
PROFIBUS) appears.
3.10 Checking Network Cabling
1.
2.
3.
Danfoss A/S © 07/2015 All rights reserved.
Mount the new front cover and the LCP.
Attach the sticker with the correct product name
to the front cover.
If the address has not been set via the address
switches, go to parameter 9-18 Node Address to
set the address.
Connect to a running PROFIBUS master.
Check that network cabling is correct:
3a
Check that the net status LED flashes
green in any pattern, except search baud
rate, see Table 4.2.
3b
Check if parameter 9-63 Actual Baud Rate
shows the same baud rate as the
PROFIBUS master.
3c
Check that the bit baud rate search in
parameter 9-53 Profibus Warning Word is
not active.
3
3
13