Dungs FRSBV 10010 Series Benutzerhandbuch - Seite 12

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Controller Dungs FRSBV 10010 Series herunter. Dungs FRSBV 10010 Series 20 Seiten.

Dungs FRSBV 10010 Series Benutzerhandbuch
9. Installation
9.1 General instructions
• Installation only in accordance with 
applicable policies and subject to
compliance with local regulations,
obtain permits required if necessary.
• Install the device in a building or
enclosure, no outdoor installation
absent appropriate safety measures!
• Fit the working range with conventional safe-
guards.
• The lifting gear used must be suited for the loads
to be lifted.
• Provide sufficient installation space for mainte-
nance and cleaning.
• The installation must not impair the operation of
other components.
Check before installing!
• The in- and output side shut-off valves are closed.
• The line is combustion gas free.
• Prevent a gas / air mixture: Monitor the room
atmosphere for leaking gas on an ongoing basis
using suitable gas concentration testers.
• Ensure electrically conductive bridging. Prevent touch
voltage and ignitable spark discharge.
• The rating plate's performance data agree with the
order data.
• The maximum input pressure of the system is less than
the maximum permissible pressure of the valve.
• Remove the connecting threads' protective cap –
if present.
• Maintain minimum clearances for adjustment.
• The input side pipeline is free of dirt and water.
Bear in mind during installation!
• Lay the air feed and extraction lines separately.
• Route the ventilation lines into the open: The gas has
to be able to escape into safe surroundings.
• Pay attention to the flow direction (arrow) on the
housing.
12 ... 20