Dunster House G3-1824HPB Installationshandbuch - Seite 15

Blättern Sie online oder laden Sie pdf Installationshandbuch für Gartenhäuser Dunster House G3-1824HPB herunter. Dunster House G3-1824HPB 18 Seiten. Hangover pent bar 1.8m x 2.4m

Dunster House G3-1824HPB Installationshandbuch
G3-1824HPB - Hangover Pent Bar - Assembly Steps
Step 6 : BAR
Items:
3x ST-PT3535260
3x ST-PT3535260.A
3x ST-PT3535260.38.52
1x ST-PT-PAR35701500.A
SCREW 60 mm
Bar Supports:
Fix the Support Bracket to the Bottom Front Panel.
Using 2x 70mm Screws as shown in the images below.
Repeat this step 3 times.
698
698
15
ST-PT-PAR35701500
** Pre-drill parts before fixing screws **
3x ST-PT-PAR35701500
18x 60mm Screw
6x 70mm Screw
Begin by placing 1x ST-PT3535260, 1x ST-PT3535260.A and 1x
ST-PT3535260.38.52 together in the same formation as shown in
the image to the left.
Once completed, fix 3x 60mm Screws into the areas displayed.
Repeat this step 2 times.
15
Bar Top:
Fix 1x ST-PT-PAR35701500.A ensuring the notch clips onto the Front Panel.
Refer to the image below
Use 3x 60mm Screws.
Continue assembling the bar by fixing 3x ST-PT-PAR35701500 to the initially
fixed component.
Ensuring they are equally spaced.
Use 6x 60mm Screws.
FRONT PANEL
Notch
ST-PT-PAR35701500.A
Equally Spaced.
Equally Spaced.
Page 15