Dunster House H4-2442SSH Gebrauchsanweisung - Seite 15
Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Gartenhäuser Dunster House H4-2442SSH herunter. Dunster House H4-2442SSH 16 Seiten. Sanctuary ii shed - 2.4m x 4.2m (8ft x 14ft)
STEP 12: FASCIA BOARD AND DIAMOND FINIAL
Items:
4x
ST-PT16701275.75.75 (Fascia board)
2x
ST-PT1680140 (Finial)
16x 35mm SCREWS
Principle of installation - Front views
35mm Screws
STEP 13: PANEL JOINT TRIM
Items:
6x
ST-PT19451855 (SIDES)
1x
ST-PT19452145 (REAR)
1x
ST-PT1945310 (FRONT)
39x
35mm SCREW
13a) Position ST-PT19451855 over
the side panel joints. use 10x 35
screws per each joint.
13b) Position ST-PT19452145 over
the side panel joints. use 10x 35
screws per each joint.
13c) Position ST-PT1945310 over the
side panel joints. use 4x 35 screws
per each joint.
Assembly Steps
12a) Position the fascia boards to the correct position as shown in the
diagram below. Fascia boards should overhang the roof boards by 10mm.
Fix each fascia board to the wind brace by using 3x 35mm screws.
12b) Position the diamond finials to correct position as shown in the
diagram below. Fix each diamond final onto the wind brace by using 2x
35mm screws.
Position of fascia boards
and diamond finials
FRONT
20
Pre-drill parts before fixing with screws
Page 15