Dunster House Leviathan SideShed P5-1530SS Installationshandbuch - Seite 15

Blättern Sie online oder laden Sie pdf Installationshandbuch für Outdoor-Einrichtung Dunster House Leviathan SideShed P5-1530SS herunter. Dunster House Leviathan SideShed P5-1530SS 20 Seiten.

Assembly Steps for Leviathan SideShed 1.5m x 3.0m
** Avoid splitting timber parts by pre-drilling all screw holes **
Step 7
Components Required
QTY
PART NUMBER
3
CP1 - 84x910x2120 - P5 PANEL
36
SCREW 60 mm
6
M10 Plain Washer
6
M10 Shield Anchor
6
M10x110mm Hex Head Bolt for
Shield Anchor
Fix the wall assembly from the previous step to the main gazebo 120x120 posts and main
gazebo purlin, using 60mm screws.
Ensure the assembled wall meets the bearer assembly before securing.
SCREW 60 mm
Fix the panels into the concrete base by drilling Ø16 holes 80mm deep (2 per
panel) and inserting the shield anchors into the holes.
Fix the panels by inserting M10x110mm bolts and M10 washers and tighten
until secure.
Fix 3x CP1 - 84x910x2120 - P5 PANEL as
shown using 60mm screws.
Ensure outer faces of frames and outer
cladding faces are flush between all 3 panels.
SCREW 60 mm
M10 Shield Anchor
SCREW 60 mm
M10x110mm
bolt &washer
M10 shield anchor
( n 16 hole 80mm deep required)
Page 15
CP1 - 84x910x2120 - P5 PANEL
FLUSH
FLUSH
Panel
Concrete